Wolf Meru Betriebsanweisung Seite 1

Stöbern Sie online oder laden Sie Betriebsanweisung nach Öfen Wolf Meru herunter. Wolf Meru User`s guide Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 28
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Installation / Operator /
Maintenance Manual for
Etna, Elbrus, Vesuv & Meru
Manufactured by: Imported by:
Frohnhof 9 PO Box 120
91580 Petersaurach Pound Ridge, NY
Germany USA
T: ++49 9802 951473 T: 914 764 5679
F: ++ 49 9802 9589909 F: 614 764 0465
www.wolf-bavaria.com www.wittus.com
Seitenansicht 0
1 2 3 4 5 6 ... 27 28

Inhaltsverzeichnis

Seite 1 - Maintenance Manual for

Installation / Operator / Maintenance Manual for Etna, Elbrus, Vesuv & Meru Manufactured by: Imported by: Frohnhof 9

Seite 2

10 2. Indirect method: for an appliance not certified for direct connection of outside combustion air, the outside air is ducted to a point no clos

Seite 3 - IMPORTANT!

11 2.3 Types of Chimneys The chimney is a vital part of your woodstove installation. A properly built masonry chimney or a properly installed, fac-

Seite 4 - Germany

12 Vapor Barrier At Chimney Penetration Install all venting components according to the vent manufacturer’s installation instructions. Ensure that th

Seite 6 - 12. Warranty 25

14 2.8 Combustible Wall Chimney Connector Pass-Throughs Method A. 12” (305 mm) Clearance to Combustible Wall Member: Using a minimum thickness of 3

Seite 7 - 1.3 Selecting a Location

15 3. User’s Guide 3.1 Hand Protection Please use a protective glove when opening the doors!!! You can then add wood while the handle is hot 3.2 T

Seite 8

16 ELBRUS MERU

Seite 9 - 1.7 Fresh Air

17 Heat Output Dimensions h x w x d Flue Diameter (inner) Center Height rear design Weight Area Heated Model (kW) (mm) (mm) (mm) (kg) (m3 ) V

Seite 10 - 2. Installation

18 3.5 Acceptable Fuel Acceptable fuel sources are pieces of wood with a length of 30 cm (12”) and a diameter of 10 cm (4”), as well as wood brique

Seite 11 - 2.5 Chimney Inspection

19 Central air connector with diameter of Ø 120 mm; capable of withstanding tempera-tures up to 80o C. 5. Fresh Air Supply The woodstove can only

Seite 12 - 2.7 Draft Requirements

2 Installation / Operator / Maintenance Manual VESUV Model: 0400 (Glass Sims) Model: 0402 (Tile Sims) ETNA

Seite 13

20 6. Operating Your Woodstove Etna, Elbrus und Vesuv 6.1 Regulating the Heat Draft controls to regulate secondary air are located under the door

Seite 14

21 6.2 Door Caution: Use protective glove!!! When adding wood, pull the door handle up. The door can also be opened sideways so that you can clean

Seite 15 - 3. User’s Guide

22 ash drawer 6.3. Ash Drawer The ashes will fall down into the ash drawer after you pull on the grate lever several times. Do not forget that ash

Seite 16

23 ? After a period of time, as soon as the fire is burning well, it might seem as if the heat output is less. Regulate the burn-ing process first b

Seite 17 - 3.4 Unpacking

24 Top and bottom seals are fastened with three screws to bracket. Side seal is glued in with special stove cement. 8. Cleaning and Maintenance

Seite 18 - 3.5 Acceptable Fuel

25 9. Troubleshooting 9.1 Poor Draft Conditions ? Is the chimney too short? ? Is the chimney or flue leaking? ? Is the flue protruding out fro

Seite 19 - 5. Fresh Air Supply

26 13. Replacement Parts List 13.1 Replace Tiles 13.2 Replace Glass 13.2.1 Replace glass and door handle on Etna, Vesuv and Elbrus

Seite 20 - 6. Operating Your Woodstove

27 13.2.2 Replace glass and door handle on Meru IMPORTANT: Replace glass only with glass from the

Seite 21 - 6.2 Door

28 13.2.3 Replace baffel bricks on Etna, Vesuv, Elbrus and Meru IMPORTANT: Replace baffel bricks only with baffel bricks fr

Seite 22 - 7. Heating Operation

3 IMPORTANT! CAUTION: Please read this entire manual before you install and use your new room heater. For your safety, follow these installation, op

Seite 23 - 7.6 Putting the Fire Out

4 Congratulations on the purchase of your new woodstove manufactured by Wolf Bavaria in Germany. When you purchased your new woodstove, you joined t

Seite 24 - 8. Cleaning and Maintenance

5 TABLE OF CONTENTS 1. Planning Your Installation 7 1.1 Questions to Ask Local Building Officials 7 1.2 Smoke Detectors 7 1.3 Selecting a Loc

Seite 25 - 12. Warranty

6 12. Warranty 25 13. Replacement Parts List 26 13.1 Replace Tiles 26 13.2 Replace Glass 26 13.2.1 Replace glass and door handle on Etna, Ve

Seite 26 - 13. Replacement Parts List

7 1. Planning Your Installation 1.1 Questions to Ask Local Building Officials A correct installation is critical and imperative for reducing fire h

Seite 27

8 1.4 Clearance from Combustible Walls There are listed clearances for your stove which were determined in a laboratory test, using various “cla

Seite 28

9 1.5 Floor Protection This appliance requires a non-combustible floor protection to protect against burning embers. If the floor is to be stone, t

Kommentare zu diesen Handbüchern

Keine Kommentare