Fix the metal bracket (A) to the wall using the
two holes just drilled as shown in illus 2. The
screws for fixing the bracket are provided. Use
the two cut-out triangles on the bracket to
position it exactly along the vertical axis of the
hood.
Hang the hood on the bracket as shown in
illus 3. Adjust the horizontal position moving
the hood to the right or left so that it is aligned
with the wall units. When adjustment has been
completed, without removing the hood, mark
the other four holes to be drilled (C) in the
wall. Remove the hood and drill the holes
marked (
5
/16" diameter). Then use the four
screw anchors and the four screws provided
for final fixing.
Mount the plate of the electrical system fixing
it with three screws as shown in illus 4.
8
WOLF COOKTOP LOW-PROFILE HOODS
WALL HOODS – DUCTED
IMPORTANT NOTE:
This installation must be
completed by a qualified installer or Wolf
authorized service center technician.
Locate the electrical supply through the wall
within the shaded area shown in illus 1.
Install ductwork as outlined on page 7.
If an optional backsplash is to be used, attach
it to the finished wall. Secure the hood
mounting brackets to the wall studs prior to
installing the backsplash.
FIXING TO THE WALL
Draw a line on the wall in vertical line with
your hood. Mark the first two holes to be
drilled in the wall, respecting the distances
indicated in illus 1. Drill the two holes and fit
the screw anchors provided.
For best capture of cooking impurities, the
bottom of the hood should be a minimum of
24" (610) and a maximum of 30" (762) above
the countertop.
Kommentare zu diesen Handbüchern