Wolf PI363418 Installationsanleitung Seite 9

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 20
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 8
Pro Island Hood Installation 9
wolfappliance.com/specs
Ceiling Framing
IMPORTANT NOTE: A
minimum 10" (254) opening in the
ceiling is required to accommodate the ductwork neces-
sary for proper ventilation.
1) Layout dimensions of the top plate of the hood (or top
of duct cover) on the ceiling. The top plate dimensions
will vary with the width of the island hood. Refer to the
illustration and chart on page 7.
2) Construct the ceiling framing using minimum 2" x 4"
lumber. Proper structural support is required to accom-
modate the weight of the hood.
3) Mark the center location of the hood. Install 2" x 4"
blocking between ceiling joists. Refer to the illustration
below.
4) Drill four
5
/3
2
" diameter holes in the framing to match
mounting holes in the top plate of the hood (or top of
duct cover).
Ceiling framing.
Framing must be fastened together and to ceiling joists
to provide enough structural strength to support the
weight of the hood and internal blower, if applicable.
Seitenansicht 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 19 20

Kommentare zu diesen Handbüchern

Keine Kommentare